Dear crew,

After much hemming and hawing over the design for the White River Southern's paper mill on my 30' long shelf, I realized that once again I'd bitten off more than I can chew.

30' long, 15" inches wide along the main run plus 20" on the turnback loops...it's a lot of space to fill! Excessive real estate is what doomed the CMRY, and I made the same mistake again.

NO MORE!

I violently downsized my design, pulling from British design principles and microlayouts. The big benchwork is still there, untouched but unused. My guiding principles are as follows:
  • Most of the time, I operate by myself for half an hour or less
  • Building a layout that will allow short, impromptu operation will allow me to operate much more frequently
  • A minimum of real estate will allow me to focus on quality instead of quantity, a problem that has plagued all my previous layouts
  • Because layouts are easy to store, I can have more than one at the same time!
  • Because layouts are quick to complete and I can have more than one, I can dabble and experiment with little investment besides some wood and a minimum of track...and I'm seriously considering doing this. BRB&L? Dystopian society? Sugar cane in the tropics? I need to learn the basics of scratchbuilding and then I'm going nuts.
For the present, though, I present to you the next iteration of the White River Southern's modeled section. As I write this, it's sitting on my old benchwork and is fully armed and operational! (Fire at will, commander!)


On a 6'x1' board, I've built an Inglenook switching layout. Here's a track plan with siding lengths:


How is it operated?
  1. The layout starts with seven cars and one locomotive.
  2. Four cars are selected at random.
  3. A train must be built from those four cars, in the order they were selected.
It seems simple, but since the lead is only two cars and a locomotive, it's nothing like operating a classification yard. It's much more straightforward and prototypical than a timesaver, but building this four-car train at realistic speed can keep me entertained for a good fifteen minutes.

The theme?

A seaside branch line terminus in Maine with an undecided industry seaside. It's picturesque with a lighthouse on the coast, tracks on a quay, and a quiet little seaside town.

There isn't a lot to look at right now (soldered and painted tracks and the ocean bank) but you'll be seeing much faster progress than on a larger layout without the influence of analysis paralysis!

The salvaged skyboard keeps trains off the floor, and will be cut down to the profile of the building flats abutting them or painted black. I'm not having a permanent backdrop on this layout, instead using the one on the big benchwork this sits on, and maybe photographing it outdoors. 



The shoreline bulge at middle right in the photo below is for the lighthouse. The lighthouse keeper's house will be on a sandy rolling bluff on the other side of the tracks.


Questions? Comments?

Joe, you really have no excuse not to build a layout...I have a 6'x1' shelf and $0 budget! This is all salvaged wood and track, and I'll be scratchbuilding or kitbashing old kits I have lying around!

Saturday, February 22, 2014

February 22, 2014: Move the Mill!


Joe and I finished the benchwork today and laid out the mill track plan, a rather arduous process! 20 cars in and 20 cars out is a tough load for any set of industry and auxiliary tracks, especially with a main line through the middle of it!

Unfortunately, incorporating the MV as an active route is NOT possible. With the need for a 20-car siding for arrivals and departures (with space for another 20 cars on other tracks), the junction would be so far right that the mainline run on the combined MV/WRS trackage is about ten feet, and we have to fit another track into what is already a too-narrow shelf.

Instead, only the WRS main line is present.

There's a long 20-car siding behind the main that can store a full train of cars for the mill. In front of the main is another siding that's a working track for the mill switcher, with easy access to most tracks.


From left to right in the photo below: pulpwood, yard/storage, yard/working track, main line, storage siding/AD track




There's still a fiddle yard of sorts inside the balloon. We'll see how this is used.



Next up: I'm going to explore taking this back to a dead-end branch line and having both operators switch the mill, one in the yard, one in the mill. With the mill on the left. I'll keep you in the loop.

Sunday, February 2, 2014

February 2, 2014: Initial Mill Trackage


I've finished the benchwork for the paper mill section. All that's left is homasote subroadbed, two .5" layers. I took the time to lay out the mill track plan so I can figure out where the river enters the foreground between the yard and the fascia.


Alex, you've seen the general gist of this, but the mill trackage has changed a bit. For Joe's sake I'll explain the full track plan:

To the left of the mill, there's a three-track yard serving the mill. The front track (Yard 1) is the main/thoroughfare and will be generally kept clear. Yard 2 is a classification track and Yard 3 is used for arrivals and departures as it's the only track that will fit an entire session worth of inbound or outbound cars: 20-25 cars.

To the left of the pulpwood gons and directly underneath the red boxcar in the photo is a crossover between Yard 1 and Yard 2. It's part of the ladder but the pulpwood track has a connection allowing it to be used as a runaround track.

The rest of the ladder is pretty straightforward. Yard 3 is considerably longer than 1 and 2, allowing me to fit the whole train for arrivals and departures.

In the middle of the ladder, the mill trackage joins in with a switchback connection. In the photo above, the curved track through the backdrop with the boxcar is Scrap Paper Unloading (this is a hybrid pulp/recycled mill), the blue airslide is on Additives, and the covered hoppers and tankcars are on the Bleach Plant track, which handles all chemical receiving and byproduct shipping. In the distance on the switchback lead is Paper Shipping, with room for seven boxcars. The track closest to the backdrop is the return loop, which will be hidden inside mill buildings.


I mocked up the mill structures with wood to give you (and myself) an idea of what the shape of the mill will be like. The Scrap Paper track and mill lead/return loop connection will be hidden with buildings and a conveyer (with building flats lining the tracks on the other side because people will look through the hole), the Additives track will be a covered shed, and the mill buildings will be pretty much unbroken all the way to the end of Shipping where hills take over the job of hiding the return loop.


There will be an industrial road between the tracks and the mill, and it needs somewhere to go. In the gap between the tankcar facility and the hopper dumps the road will venture between buildings. It may disappear at an angle or do something else, that's yet to be decided. But we've got to have our rails-buried-in-pavement trackage and that road needs somewhere to go!


The Scrap Paper Track uses an 18" radius curve, which is really tight. It won't be a problem for a Geep and 50' boxcars at a scale 10mph, but I wanted to make sure it looked okay. It's tight, certainly, but real mill trackage often uses very sharp curvature. This section will be embedded in the industrial road and wouldn't be pleasant on the ears (the Boylston Street curve with a GP18 and loaded boxcars, anyone?) but I think the curve will look like it's intentionally sharp for effect, and not me trying to cram track in.


I also took a look at the ladder with cars, and it looks really neat. It must have been quite a task with hand signals before the advent of radio, but I like the look.

Also, Alex and I talked about where we can stack pulpwood, and that area on the left in this photo will be perfect for it!


Out on the Shipping end of things, there's a long building with the yard in front. The river hasn't yet made an appearance. I could cram it in front with manmade walls, but I don't feel the need. There will be plenty of space along the length of the yard and in the town, and I want to give my miniature train crews some space to operate the crossover.


Further out towards the town along the yard, the river comes into the modeled area between the yard and the aisle and there's a hydroelectric power station like the one in this location on my almost-prototype, Shelburne Falls MA.
http://binged.it/1eH9VlC

I haven't completed benchwork south of this location yet into the town, but that will come in due time. I plan to finish the backdrop seams, lay down homasote, and get trains running before starting on that. It's been too long since I've had an operating layout, and I want to see how well the mill trackage works in case I need to make changes that affect how far south the yard extends.

---