Sunday, February 2, 2014

February 2, 2014: Initial Mill Trackage


I've finished the benchwork for the paper mill section. All that's left is homasote subroadbed, two .5" layers. I took the time to lay out the mill track plan so I can figure out where the river enters the foreground between the yard and the fascia.


Alex, you've seen the general gist of this, but the mill trackage has changed a bit. For Joe's sake I'll explain the full track plan:

To the left of the mill, there's a three-track yard serving the mill. The front track (Yard 1) is the main/thoroughfare and will be generally kept clear. Yard 2 is a classification track and Yard 3 is used for arrivals and departures as it's the only track that will fit an entire session worth of inbound or outbound cars: 20-25 cars.

To the left of the pulpwood gons and directly underneath the red boxcar in the photo is a crossover between Yard 1 and Yard 2. It's part of the ladder but the pulpwood track has a connection allowing it to be used as a runaround track.

The rest of the ladder is pretty straightforward. Yard 3 is considerably longer than 1 and 2, allowing me to fit the whole train for arrivals and departures.

In the middle of the ladder, the mill trackage joins in with a switchback connection. In the photo above, the curved track through the backdrop with the boxcar is Scrap Paper Unloading (this is a hybrid pulp/recycled mill), the blue airslide is on Additives, and the covered hoppers and tankcars are on the Bleach Plant track, which handles all chemical receiving and byproduct shipping. In the distance on the switchback lead is Paper Shipping, with room for seven boxcars. The track closest to the backdrop is the return loop, which will be hidden inside mill buildings.


I mocked up the mill structures with wood to give you (and myself) an idea of what the shape of the mill will be like. The Scrap Paper track and mill lead/return loop connection will be hidden with buildings and a conveyer (with building flats lining the tracks on the other side because people will look through the hole), the Additives track will be a covered shed, and the mill buildings will be pretty much unbroken all the way to the end of Shipping where hills take over the job of hiding the return loop.


There will be an industrial road between the tracks and the mill, and it needs somewhere to go. In the gap between the tankcar facility and the hopper dumps the road will venture between buildings. It may disappear at an angle or do something else, that's yet to be decided. But we've got to have our rails-buried-in-pavement trackage and that road needs somewhere to go!


The Scrap Paper Track uses an 18" radius curve, which is really tight. It won't be a problem for a Geep and 50' boxcars at a scale 10mph, but I wanted to make sure it looked okay. It's tight, certainly, but real mill trackage often uses very sharp curvature. This section will be embedded in the industrial road and wouldn't be pleasant on the ears (the Boylston Street curve with a GP18 and loaded boxcars, anyone?) but I think the curve will look like it's intentionally sharp for effect, and not me trying to cram track in.


I also took a look at the ladder with cars, and it looks really neat. It must have been quite a task with hand signals before the advent of radio, but I like the look.

Also, Alex and I talked about where we can stack pulpwood, and that area on the left in this photo will be perfect for it!


Out on the Shipping end of things, there's a long building with the yard in front. The river hasn't yet made an appearance. I could cram it in front with manmade walls, but I don't feel the need. There will be plenty of space along the length of the yard and in the town, and I want to give my miniature train crews some space to operate the crossover.


Further out towards the town along the yard, the river comes into the modeled area between the yard and the aisle and there's a hydroelectric power station like the one in this location on my almost-prototype, Shelburne Falls MA.
http://binged.it/1eH9VlC

I haven't completed benchwork south of this location yet into the town, but that will come in due time. I plan to finish the backdrop seams, lay down homasote, and get trains running before starting on that. It's been too long since I've had an operating layout, and I want to see how well the mill trackage works in case I need to make changes that affect how far south the yard extends.

---

Questions? Shoot me an email.