Joe and I finished the benchwork today and laid out the mill track plan, a rather arduous process! 20 cars in and 20 cars out is a tough load for any set of industry and auxiliary tracks, especially with a main line through the middle of it!
Unfortunately, incorporating the MV as an active route is NOT possible. With the need for a 20-car siding for arrivals and departures (with space for another 20 cars on other tracks), the junction would be so far right that the mainline run on the combined MV/WRS trackage is about ten feet, and we have to fit another track into what is already a too-narrow shelf.
Instead, only the WRS main line is present.
There's a long 20-car siding behind the main that can store a full train of cars for the mill. In front of the main is another siding that's a working track for the mill switcher, with easy access to most tracks.
From left to right in the photo below: pulpwood, yard/storage, yard/working track, main line, storage siding/AD track
There's still a fiddle yard of sorts inside the balloon. We'll see how this is used.
Next up: I'm going to explore taking this back to a dead-end branch line and having both operators switch the mill, one in the yard, one in the mill. With the mill on the left. I'll keep you in the loop.





